Product Description
A 20-foot air-cooled mining container for up to 162 ASIC miners. Miners are not included.
Power planning at full capacity
The load depends on the miners you install. Using Bitmain’s ratings, 162 Antminer S21 (200 TH/s, 3,500 W) units draw about 567 kW, and 162 S19k Pro (120 TH/s, 2,760 W) units draw about 447 kW, before the container’s own fans.
Before you order
- Power: an industrial supply and transformer sized for the full miner load.
- Site: a level, hardened pad with room for intake and exhaust airflow.
- Before you pay: contact us for the electrical, cooling and network layout of the unit, and to confirm delivery access to your site. Containers are large freight items.
- Not included: hosting, site preparation, installation, monitoring, maintenance and pool management. This listing is for the equipment only.
Shipping, Payment, Warranty & Returns
- Shipping: United States only. Flat rate of $120 per order. Orders are dispatched within 5-10 business days after payment is received, and transit within the US takes 0-1 business days after dispatch. See our Shipping Policy.
- Payment: bank transfer. Our bank details are provided after you place your order. See our Payment Policy.
- Warranty: 30-day limited warranty from Bitminers, starting on the date of delivery. A manufacturer warranty may also apply. See our Warranty Policy.
- Returns: eligible items can be returned within 20 calendar days of delivery. See our Return & Refund Policy.
Related guides: Crypto mining containers explained · Planning a mining farm · Air vs hydro cooling
Mining results depend on electricity costs, network difficulty and cryptocurrency prices. Bitminers does not guarantee mining profitability or return on investment.
Additional Information
| Condition | New |
|---|









Reviews
There are no reviews yet.